-
- 24 JunMSc3 InfoMatters Design Studio P2 Review on the 24th June 2011
- 22 JunMSc1 InfoMatters Design Studio Final Reviews
- 21 JunPaper presentation “Collaborative Design Of Parametric Sustainable Architecture” by Hans Hubers at MISBE2011 conference
- 20 JunMSc2 deepFORMATIONS Design Studio final review & prototypes exhibition
- 12 JunHyperbody work featured in the book "The New Mathematics of Architecture" by Mark Burry and Jane Burry
- 11 JunPAN Architects & Hyperbody work illustrated in Zeppelin Magazine (projects featured on the cover)
- 10 Junlecture "Collaborative Parametric Architectural Design" by Hans Hubers at EuropIA Conference
- 10 Junlecture "Programmable Sustainable Architecture" by Kas Oosterhuis at the ENERGYCITY Conference in Graz
- 28 MayAn interview with Tomasz Jaskiewicz by dr. Lasse Gerrits
- 27 MayChristian Friedrich co-tutors Sens[e-Res]ponsive Architecture Workshop in Chania
-
-
Hyperbody graduate students Ralph Cloot and Arwin Hidding in collaboration with Sina Mostafavi and supervised by Kas Oosterhuis design a building for Neurotopia
For the last ten years, Erik Sep has been working at his expanding miniature city called Neurotopia. An ever growing city where he continuously collects, builds, demolishes and reorganizes. For one of his vacant plots within the city, the Hyperbody graduate students Ralph Cloot and Arwin Hidding where invited to design a building that reacts to the surrounding structures using design-to-robotic-production methods, in collaboration with Sina Mostafavi and supervised by Kas Oosterhuis.
In order to create a reaction towards the existing conditions on the site, we simulated function placements and people flows using processing. From this abstraction of the building we were able to shape the macro-scale (space-scale). A custom made algorithm was applied afterwards that takes into account a stress, curvature and solar radiation analysis in order to materialise the meso-scale (component-scale). As an architectural input we wanted to achieve a gradual transition between the structure, the closed segments (0% porosity), the openings (100% porosity) and the ornaments. The entire piece was divided into five EPS components, each of these were milled out using a Kuka industrial 6-axis robotic arm. The micro-scale (material-scale) of the project was made up of three different material removal fases, gradually creating more detail the closer the robot came to the object within the EPS.
The finished work is displayed at the opening of Neurotopia's exhibition at Galerie Frank Taal in Rotterdam on september the 16th, 2016.
http://www.franktaal.nl/actueel/show/erik_sep___neurotopia_in_de_van_speyk_nr__192.html
http://www.neurotopia.nl/