-
- 24 MarInternational Colloquium: Design-to-Robotic-Production & -Operation (D2RP&O)
- 18 Mar18th of March Henriette Bier and Sina Mostafavi participate in international symposium Les formes du digital at the Centre Pompidou
- 14 MarMarch 14th - June 19th Robotic Building team participates in the exhibition Imprimer le monde at the Centre Pompidou
- 14 Mar14 March 15:00h Lecture by Jose Sanchez: Architecture for the commons
- 14 MarKas Oosterhuis holds masterclass The How and Why of Parametric Design on Tuesday 14 March 16.00h during Design Days Dubai 2017
- 14 MarKas Oosterhuis exhibits his parametric Body Chair at Design Days Dubai 2017 from 14-18 March 2017
- 10 FebDr. Nimish Biloria appointed as Scientific Reviewer for the 2017 eCaaDe conference: Sharing of computable Knowledge, ShoCK!
- 06 FebFibrous Smart Material Topologies project to be exhibited at BouwBeurs 2017.
- 03 FebFriday 3 February 2017 at 9:45 in protoSPACE: Final Presentation MSc 1 Design Studio: Design-to-Robotic-Production (D2RP) for SMART Student Housing
- 24 JanHenriette Bier acts as reviewer for Elsevier Journal Automation in Construction
-
-
Hyperbody graduate students Ralph Cloot and Arwin Hidding in collaboration with Sina Mostafavi and supervised by Kas Oosterhuis design a building for Neurotopia
For the last ten years, Erik Sep has been working at his expanding miniature city called Neurotopia. An ever growing city where he continuously collects, builds, demolishes and reorganizes. For one of his vacant plots within the city, the Hyperbody graduate students Ralph Cloot and Arwin Hidding where invited to design a building that reacts to the surrounding structures using design-to-robotic-production methods, in collaboration with Sina Mostafavi and supervised by Kas Oosterhuis.
In order to create a reaction towards the existing conditions on the site, we simulated function placements and people flows using processing. From this abstraction of the building we were able to shape the macro-scale (space-scale). A custom made algorithm was applied afterwards that takes into account a stress, curvature and solar radiation analysis in order to materialise the meso-scale (component-scale). As an architectural input we wanted to achieve a gradual transition between the structure, the closed segments (0% porosity), the openings (100% porosity) and the ornaments. The entire piece was divided into five EPS components, each of these were milled out using a Kuka industrial 6-axis robotic arm. The micro-scale (material-scale) of the project was made up of three different material removal fases, gradually creating more detail the closer the robot came to the object within the EPS.
The finished work is displayed at the opening of Neurotopia's exhibition at Galerie Frank Taal in Rotterdam on september the 16th, 2016.
http://www.franktaal.nl/actueel/show/erik_sep___neurotopia_in_de_van_speyk_nr__192.html
http://www.neurotopia.nl/